Water Distribution System

The water distribution system is located inside the tower between the drift eliminator and the fill media. It ensures uniform distribution of hot water from the plant onto the fills. When water temperature is below 55°C, the main pipe and bypass are applied in PVC; for higher temperatures they are implemented in PP or FRP (CTP). The main pipe and bypass are produced with leak-tight connections, allowing easy assembly/disassembly without cutting and splicing during maintenance.
function
Uniformly distributes hot water onto the fill media
location
Inside tower, between drift eliminator and fill media
connection
Leak-tight joints; easy maintenance without cutting/splicing
materialAbove55C
PP or FRP (CTP)
materialBelow55C
PVC (main pipe + bypass)
temperatureThreshold
55°C